--- title: "Control Points Workflow" slug: "pinpoint-control-points-workflow" status: "new" updated: 2026-09-04T13:18:59Z published: 2026-09-04T13:18:59Z canonical: "rcdocs.leica-geosystems.com/pinpoint-control-points-workflow" --- > ## Documentation Index > Fetch the complete documentation index at: https://rcdocs.leica-geosystems.com/llms.txt > Use this file to discover all available pages before exploring further. # Control Points Workflow

The Control Points workflow supports the georeferencing and verification of point cloud data using measured control points. It provides a streamlined process for defining, managing, and validating control points throughout a project.

Defining Control Points

There are several ways to add control points in a project:

The workflow supports multiple target types, including:

Working with Leica Targets

Leica targets are automatically detected in project imagery and matched to their corresponding control points across the entire point cloud. If a target is assigned incorrectly or requires review, observations can be manually reassigned to the appropriate control point.

Working with Natural Targets

Natural targets are arbitrary point features with no physical targets. These targets can be defined using a dedicated 3D image viewer, allowing observations to be selected directly from project imagery. Once selected, natural target positions can be refined against neighbouring candidates in image space.

Managing Control Points

Control points can be easily managed using:

After adjustment, residual values are calculated and displayed for each control point. Residuals indicate the difference between measured and computed positions.