--- title: "Managing units and UCS when importing/exporting" slug: "cyclone-3dr-managing-units-and-ucs-when-importing-exporting" updated: 2026-09-07T11:51:53Z published: 2026-09-07T11:51:53Z canonical: "rcdocs.leica-geosystems.com/cyclone-3dr-managing-units-and-ucs-when-importing-exporting" --- > ## Documentation Index > Fetch the complete documentation index at: https://rcdocs.leica-geosystems.com/llms.txt > Use this file to discover all available pages before exploring further. # Managing units and UCS when importing/exporting ## Import ### Unit It is asked to tell the unit of the imported data (most of the time, it cannot be read automatically). According to the current project unit, a scaling will be performed. > [!NOTE] > **Example** > > A file storing data in meters imported in a project in centimeters: the point (1 m; 2 m; 3 m) becomes (100 cm; 200 cm; 300 cm). > [!CAUTION] > - If the file stores data at a wrong scale, the wrong scaling will be kept: use [Resize](/v1/docs/cyclone-3dr-applyscalec) to fix it. > - Example: a file in meters storing data in centimeters imported in a project in centimeters. The point (100 m; 200 m; 300 m) but (100 cm; 200 cm; 300 cm) in your mind becomes (10000 cm; 20000 cm; 30000 cm). > - If the current project is set in the wrong unit, the scaling will be performed correctly but you may read inappropriate dimensions: use [Repair Project Unit](/v1/docs/cyclone-3dr-repairprojectunitc) to set the appropriate unit. > - Example: a file in meters imported in a project in centimeters. The point (1 m; 2 m; 3 m) becomes (100 cm; 200 cm; 300 cm). [Repair Project Unit](/v1/docs/cyclone-3dr-repairprojectunitc) updates (100 cm; 200 cm; 300 cm) to (1 m; 2 m; 3 m). > - If a format stores unit (such as DXF, IGES or IFC), it is automatically read during the import. If the written unit is false, a wrong scaling will happen. Here, you can override the unit. > - Example: a file, said in centimeters, storing data well dimension-ed in meters imported in a project in millimeters. > - Using the unit from the file: the point (1 m; 2 m; 3 m) is read as (1 cm; 2 cm; 3 cm) thus is imported as (10 mm; 20 mm; 30 mm). > - Using the forced unit: the point (1 m; 2 m; 3 m) is red (1 m; 2 m; 3 m) thus is imported (1000 mm; 2000 mm; 3000 mm). ### UCS Some formats store User Coordinate Systems (such as LGS, IFC). A transformation, including translations and rotations, will be applied to define the object position according to the chosen UCS. > [!NOTE] > **Example** > > Coordinates given in the UCS of the source project will match the coordinates of the 3DR project WCS. ![ucs.png](https://cdn.document360.io/820e11db-8ed5-45ae-ac86-f6b77dcb2aa7/Images/Documentation/ucs.png) ***Source and target coordinate system: result when chosing UCS2*** ## Export ### Unit It is asked to choose a unit to decide what numerical values to share. According to the current project unit and the target unit, a scaling will be performed. > [!NOTE] > **Example** > > A project in meters exported to a file in centimeters: the point (1 m; 2 m; 3 m) becomes (100 cm; 200 cm; 300 cm). ### UCS When a UCS is activated, it is possible to choose to export data given in this UCS (otherwise, the WCS will be used). Consequently, this UCS will act as a WCS in the exported file. ![ucs2.png](https://cdn.document360.io/820e11db-8ed5-45ae-ac86-f6b77dcb2aa7/Images/Documentation/ucs2.png) ***UCS or WCS*** > [!WARNING] > Some formats don't use UCS; others can store several UCS like LGS. ## Send to ### Unit No scaling applied to numerical values: - The point (1 m; 2 m, 3 m) from a project in meters becomes (1 in; 2 in, 3 in) in an [AutoCAD](/v1/docs/cyclone-3dr-sendtoautocad) document in inches. - The point (1 m; 2 m, 3 m) from an [AutoCAD](/v1/docs/cyclone-3dr-sendtoautocad) document in meters becomes (1 in; 2 in, 3 in) in a project in inches. > [!TIP] > When using the [Send To](/v1/docs/cyclone-3dr-sendto) command, always make sure to work in the same unit in both applications. > > Use [Change Current Unit](/v1/docs/cyclone-3dr-changecurrentunitc) to fix the current project unit globally. ### UCS When a UCS is activated in the document, it is possible to choose to send the data given in this UCS (otherwise, the WCS will be used). > [!WARNING] > - Sending data: data are always inserted using the receiver WCS. > - Receiving data: data are inserted using the activated UCS.