--- title: "Guided Workflow | BIM Progress Monitoring and Tolerance Checking Introduction" slug: "cyclone-3dr-guided-workflow-bim-progress-monitoring-and-tolerance-checking-intro" updated: 2026-08-04T15:39:24Z published: 2026-09-07T11:52:00Z canonical: "rcdocs.leica-geosystems.com/cyclone-3dr-guided-workflow-bim-progress-monitoring-and-tolerance-checking-intro" --- > ## Documentation Index > Fetch the complete documentation index at: https://rcdocs.leica-geosystems.com/llms.txt > Use this file to discover all available pages before exploring further. # Guided Workflow | BIM Progress Monitoring and Tolerance Checking Introduction [Tolerance Checking](/v1/docs/cyclone-3dr-tolerancechecking) and [Bim Progress Monitoring](/v1/docs/cyclone-3dr-bimprogressmonitoring) workflows give the same kind of analysis but their goals are different. - Bim Progress Monitoring indicates whether a part is installed or not (it focuses on tracking the progress of construction against the project schedule). - Tolerance checking indicates whether a part is installed in the correct position according to a given tolerance (it focuses on ensuring the accuracy and quality of construction). Both cases can be confusing since matching a part and its measured points is mainly addressed thanks to their positions. It is advisable to check manually the results during the second step of these workflows.