--- title: "Check (Progress Monitoring)" slug: "cyclone-3dr-bimprogressmonitoringcheckc" updated: 2026-09-29T13:17:27Z published: 2026-09-29T13:17:27Z canonical: "rcdocs.leica-geosystems.com/cyclone-3dr-bimprogressmonitoringcheckc" --- > ## Documentation Index > Fetch the complete documentation index at: https://rcdocs.leica-geosystems.com/llms.txt > Use this file to discover all available pages before exploring further. # Check (Progress Monitoring) ![Progress Monitoring.svg](https://cdn.document360.io/820e11db-8ed5-45ae-ac86-f6b77dcb2aa7/Images/Documentation/Progress%20Monitoring.svg) This step allows to verify and edit the analysis manually. The coverage thresholds are displayed as a reminder. 1. At the startup of the command, the 3D scene split in two views: 1. An overall view, called **Progress View**, displaying the whole project and where you can select a specific BIM part to inspect. 2. A **detailed view** containing detailed information about the current selected BIM part, if any. 2. In the dialog, a **Result table** lists all BIM part and some associated data such as the coverage score, current status and global offset (median value of the offset distribution).Each time a new element is clicked in the table, the 3D views are updated. Press **SPACE** to change the current element status.The table header columns can be sorted. 3. Optionally, **filter** the visible parts according to their status. 4. Optionally, modify the parts **Transparency** to be able to see possible inner points. This transparency is temporary applied when checking the selected part. 5. Then click **Next** to validate and continue ([Export](/v1/docs/cyclone-3dr-bimprogressmonitoringexportc)). > [!TIP] > Several shortcuts are available in from the 3D views: > > - **Arrow Up/Dow** to change the current selection in the Result table > - **H** to toggle the visibility of the selected BIM part > - **Space** to change the current element status