This step allows to verify and edit the analysis manually.
-
At the startup of the command, the 3D scene split in two views:
-
An overall view, called Progress View, displaying the whole project and where you can select a specific BIM part to inspect.
-
A Detail view containing detailed information about the current selected BIM part, if any.
-
-
Optionally, update the Tolerance value and visualize the live update. Note that it will reset the status of all parts.
-
In the dialog, a Result table lists all BIM part and some associated data such as the current status, coverage score, and offset (median value of the offsets). Each time a new element is clicked in the table, the 3D views are updated: press SPACE to change the current element status. Note that the table header columns can be sorted.
-
Optionally, filter the visible parts according to their status.
-
Optionally, modify the parts Transparency to be able to see possible inner points. This transparency is temporary applied when checking the selected part.
-
Then click Next to validate and continue (Export).
Several shortcuts are available in from the 3D views:
-
Arrow Up/Dow to change the current selection in the Result table
-
H to toggle the visibility of the selected BIM part
-
Space to change the current element status