Cyclone 3DR | Which BIM Analysis feature to use?

Purpose

The goal of this page is to help you choose the right BIM Analysis tool depending on the type of Point Cloud vs BIM Model analysis you need to achieve.

BIM Analysis features

Recommandations

Cyclone 3DR

Deviation

Analysis

Progress

Monitoring

Clash

Detection

Visual

Reporting

Tolerance

Checking

Use cases

QA-QC | As-Built | Coordination | Standard | Scan to BIM Review

Monitoring sub-contractor | Invoicing | Communication | Completion of works

Design for renovation | Coordination | Clearance verification

Design for renovation | Completion | Clearance  | As-Built | Scan to BIM Review

Monitoring sub-contractor | Completion | Clearance | Standard | Scan to BIM Review

Purpose

High-accuracy comparison

Progress status

Clash detection

Manual reporting

Tolerance verification

Deliverable

3D Heatmap

1-page progress report

Detailed analysis per BIM asset

1-page progress report

Detailed analysis per BIM asset

1 summary of notes

Detailed review of all notes

1-page tolerance report

Detailed analysis per BIM asset

Suggested

Accuracy

[2 mm – 20 mm]

[2 cm –  15 cm]

[1 cm –  25 cm]

[5 cm –  50 cm]

[0,5 cm –  30 cm]

BCF Workflow

Manual

[Inspection Notes]

Automatic

Automatic

Manual

Automatic

Suggested

scanners

P-XX | RTC 360

BLK2GO | BLK ARC

BLK 360 | RTC 360 | BLK2GO

BLK2GO | BLK ARC | BLK360

Static or Mobile

Depending on the tolerance

AI Cleaning

Recommended with

AI Classification

Optimized results with Indoor Construction Site AI Model

Recommended with

AI Classification

Recommended with

AI Classification

Optimized results with Indoor Construction Site AI Model

Expertise

Surveyors, Experts

3D/BIM Specialists, Engineers, Site managers, VDC

Surveyors, Experts, VDC, 3D/BIM Specialists

3D/BIM Specialists, Engineers, Site managers, VDC

3D/BIM Specialists, Engineers, Site managers, VDC

Which editions?

Cyclone 3DR

Deviation

Analysis

Progress

Monitoring

Clash

Detection

Visual

Reporting

Tolerance

Checking

Standard

(tick) [Mesh only]

(error)

(error)

(error)

(error)

Survey

(tick) [Mesh only]

(error)

(error)

(error)

(error)

AEC

(tick)

(tick)

(tick)

(tick)

(tick)

Plant

(tick)

(error)

(tick)

(tick)

(error)

Which types of design models?

Cyclone 3DR

Deviation

Analysis

Progress

Monitoring

Clash

Detection

Visual

Reporting

Tolerance

Checking

MESHES

All formats

(tick)

(error)

(tick)

(tick)

(error)

CAD

DWG, DXF, STEP, IGES, COE

(tick)

(error)

(tick)

(tick)

(error)

BIM

IFC Format

(tick)

(tick)

(tick)

(tick)

(tick)

BIM

RVT Format

(tick)

(error)

(tick)

(tick)

(error)

Export BCF tickets

The following commands embed the capacity to export BCF (BIM Collaboration Format) files that contain information from IFC model for an open-BIM experience with other software and BIM solutions.

Cyclone 3DR 2025.2 supports BCF 2.1 format (export).

Menu

Feature

Comment

Analysis

Inspection Notes

Input: Inspected BIM Model

Feature to report issues from an inspection and that gives the ability to create manual notes that contains screenshots, images from disk, labels and deviation values (attached CSV), clipping object information and coordinates and orientation of viewpoint; but also, a user-defined title, an assignment (email address), a comment and a priority.

Analysis

Visual Notes

Input: BIM Model

Feature to report comments and notes based on visual analysis of a BIM design model and the captured reality. The feature gives the ability to create manual notes that contains screenshots, images from disk, distance measurements, clipping object information and coordinates and orientation of viewpoint; but also, a user-defined title, an assignment (email address), a comment and a priority.

Analysis

Clash

Input: A point cloud and a BIM Model

Feature to report clashes that contain screenshot, clash status (clash, no clash or undefined) and a comment.

All tickets refer to the same assignment (email address).

Analysis

Progress Monitoring

Input: A point cloud and a BIM Model

Feature to report the progress monitoring analysis.

Default export contains a summary (progress distribution between installed, in progress, not installed and no data).

Ability to customize the export and to create additional single tickets per analyzed element depending on their status (installed, not installed, in progress).

All tickets refer to the same assignment (email address).

Analysis

Tolerance Checking

Input: A point cloud and a BIM Model

Feature to report a Tolerance Checking analysis.

Default export contains a summary (distribution among within tolerance | out of tolerance | no data)

Ability to customize the export and to create additional single tickets per analyzed element depending on their status (within tolerance | out of tolerance | no data).

All tickets refer to the same assignment (email address).

Touch Mode

BIM Inspection

Input: A point cloud and a BIM Model

The “Touch Mode” BIM Inspection workflow also offers a way to create BCF issues.

The contents are similar to the notes that are exported from “Inspection notes”, which is the desktop equivalent of BIM Inspection.